Ted and I have been very busy during the last six weeks, but we’ve got all of our tasks checked off the list. Whew!
Indoor jobs:

The squeaky boards are above the ductwork, so they expand and contract a lot. The floor guy told us to sprinkle talcum powder over the cracks between boards, then walk on them for a week to work it in. Success!

The dual-light blinds have translucent fabric (top photo) and opaque fabric (lower part in bottom photo) and can be adjusted to control light.
Re-upholster kitchen chairs. To be picked up in three days and returned to us with new fabric.

Come on in! Everything is clean and ready to swim or to sit in the shade of the new umbrellas.

Ted ran the shrub trimmings through his chipper and changed the brush pile into mulch.

This was the hardest job to schedule and to complete. In this rainy spring, it took six weeks to get three dry, calm days in a row to power wash and apply two coats of seal to our 2000+ sq. ft. of concrete.

Aaaahhhh. Ready for summer fun.